首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   19篇
  免费   2篇
  国内免费   1篇
电工技术   2篇
综合类   1篇
化学工业   1篇
机械仪表   1篇
能源动力   4篇
无线电   4篇
一般工业技术   1篇
原子能技术   8篇
  2020年   1篇
  2013年   1篇
  2011年   4篇
  2010年   3篇
  2008年   6篇
  2007年   1篇
  2006年   1篇
  2005年   1篇
  2004年   1篇
  2003年   1篇
  1980年   2篇
排序方式: 共有22条查询结果,搜索用时 0 毫秒
21.
本文提出了一种新的二次雷达应答分析的抗干扰处理技术,通过准确提取应答框架位置和参考信号特征,利用应答脉冲与参考信号的信号特征一致性进行有效信号判定.采用该方法,能在高密度应答中有效地筛选真实应答,去除幻影和FRUIT干扰.通过理论分析和产品使用证明,即使在高密度询问下和复杂的FRUIT干扰,应答信号存在非常严重的重叠情况时,本文的抗干扰处理技术都具有极高的真实应答的检测概率和极低的虚警概率.  相似文献   
22.
Operation of pressurised water reactors involves shutdown periods for refuelling and maintenance. In preparation for this, the reactor system is cooled down, depressurised and partially drained. Although reactor coolant pressure is lower than during full-power operation, there remains the possibility of a loss-of-coolant accident (LOCA), with a certain but low probability. While the decay heat to be removed is lower than that from a LOCA at full power, the reduced availability of safety systems implies a risk of failing to maintain core cooling, and hence of core damage. This is recognised though probabilistic safety analyses (PSA), which identify low but non-negligible contributions to core damage frequency from accidents during cooldown and shutdown. Analyses are made for a typical two-loop Westinghouse PWR of the consequences of a range of LOCAs during hot and intermediate shutdown, 4 and 5 h after reactor shutdown respectively. The accumulators are isolated, while power to some of the pumped safety injection systems (SIs) is racked out. The study assesses the effectiveness of the nominally assumed SIs in restoring coolant inventory and preventing core damage, and the margin against core damage where their actuation is delayed. The calculations use the engineering-level MELCOR1.8.5 code, supplemented by the SCDAPSIM and SCDAP/RELAP5 codes, which provide a more detailed treatment of coolant system thermal hydraulics and core behaviour. Both treatments show that the core is readily quenched, without damage, by the nominal SI which assumes operation of only one pump. Margins against additional scenario and model uncertainties are assessed by assuming a delay of 900 s (the time needed to actuate the remaining pumps) and a variety of assumptions regarding models and the number of pumps available in conjunction with both MELCOR and versions of SCDAP. Overall, the study provides confidence in the inherent robustness of the plant design with respect to LOCA during cooldown to cold shutdown, and in the validity of a two-tier calculational method. The results have been directly used in updating the plant shutdown PSA, by changing the success criteria for core cooling during cooldown of the plant and showing a reduction in overall risk.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号